Gateway 2 & Building Safety Support

Building safety, navigated.

Gateway 2 is more than a regulatory submission. It tests whether the design is sufficiently developed and coordinated, whether compliance has been clearly demonstrated and whether construction can proceed on a robust basis.

Friel Welch provides technical coordination and project level support through Gateway 2 and the wider higher risk building control process. Working alongside the client, Principal Designer, Principal Contractor and consultant team, we coordinate information, identify gaps, manage interfaces and help structure a clear and coherent application.

Warehouse with solar panels on roof, a large truck docked, cars in parking, and people near entrance.

Supporting the dutyholders, not replacing them

The statutory responsibilities remain with the appointed dutyholders. Friel Welch does not act as Principal Designer or Principal Contractor, nor do we approve or certify compliance on behalf of the Building Safety Regulator.

Our role is to provide the coordination, information management and project leadership that helps the dutyholders discharge their responsibilities effectively.

Our approach

Coordinating approval, procurement and delivery

We coordinate drawings, reports, compliance information and key design decisions into a structured submission. We also track dependencies, third-party interfaces and contractor designed portions, ensuring their implications for compliance, procurement, cost and programme are understood.

This is particularly important where specialist design must be incorporated before the relevant supply chain is appointed. We help the team establish a strategy that is compliant and buildable without losing sight of commercial reality.

The result is a clearer Gateway 2 application and a more coordinated route into construction, reducing the risk of avoidable queries, delay and resubmission.

What we deliver
0
1
2
3
4
5
6
7
01

Gateway 2 readiness review

Submission gaps, risks, dependencies, and approval strategy.

02

Technical coordination

Managing information flow across consultants, dutyholders, and specialists.

03

Submission package management

Structuring Gateway 2 deliverables for review and approval.

04

CDP and procurement review

Contractor Design Portion risks, cost impact, and procurement timing.

05

Statutory and third-party tracking

Authorities, utilities, warranty, party wall, and adjoining-owner matters.

06

Golden thread support

Document control, evidence records, and information management.

06

Regulator query support

Coordinating responses during the determination period.

How this connects

Building safety considerations often begin during Technical Feasibility, where the regulatory exposure of a site or scheme is identified before the project commits. As the design develops, Gateway 2 and Building Safety Support connects closely with Design Management and Technical Coordination, Technical Delivery and Construction Support, and Contractor Design Portion Management through procurement and construction.